About KCP

Focussed growth through right action

Milestones

2016
Launch of Mercure Hotels Hyderabad KCP, Hyderabad
2014
Commissioning of 18MW Thermal Power Plant at Muktyala Cement Plant, Ramakrishnapuram, Muktyala, Andhra Pradesh.
2013
Commissioning of 1.15 MW Solar at Muktyala Cement Plant, Ramakrishnapuram, Muktyala, Andhra Pradesh.
2011
Cement Plant II Commissioned at Ramakrishnapuram, Muktyala, Andhra Pradesh.
2006
Wind Power generating Unit setup at Uthumalai village in Tirunelveli District of Tamil Nadu.
2001
Heavy Engineering Plant II setup at Arakonam near Chennai, to execute medium to large sized fabrication projects.
2000
KCP Technologies Limited setup to provide high quality IT Solutions & Engineering Technical Services.
1999
Hydel Power Division setup at Nekkarikallu, Andhra Pradesh on the Guntur Canal of Krishna river to generate 8 MW of power.
1999
KCP Vietnam Industries Limited, a fully owned subsidiary of The KCP Limited setup to manufacture sugar at Thua Thien Hue Province at Central Vietnam. This 2500 TCD plant was shifted to Son Hoa District, Phuyen Province in 2001.
1995
FCB-KCP Limited, (now Fives Cail-KCP) setup as a joint venture with Fives Cail Group of France for the design and manufacture of Sugar Plants.
1995
KCP Sugar Manufacturing Division demerger into a separate company, KCP Sugar & Industries Limited.
1984
Arakonam Castings & Forgings Limited, started as a joint venture between The KCP Limited and the Tamilnadu Industrial Development Corporation (TIDCO).
1984
Fuller The KCP Limited, a joint venture with Fuller International Inc, USA was launched, for the design and manufacture of large-sized cement plants and other mineral processing equipment. KCP divested its stake to FL Smidth, Denmark in 1996.
1967
EIMCO-The KCP Limited, started as a joint venture between The KCP Limited and EIMCO Corporatation, USA. Currently a 100% subsidiary of KCP Sugar & Industries Limited.
1958
Cement Plant I , setup at Macherla, Andhra Pradesh with a state-of-the-art cement manufacturing plant. India's first dry process kiln was installed at Macherla by HUMBOLDT AG, Germany in 1958 (while still a prototype in Europe).
1955
Heavy Engineering Plant I, setup at Tiruvottiyur, Chennai consisting of an integrated manufacturing facility, which caters to a wide range of heavy mechanical equipment and sub-systems for core sector industries.
1941
An 800 TCD Sugar Plant was setup at Vuyyuru, Andhra Pradesh, India by Sri. V. Ramakrishna, Founder Chairman of KCP.
Copyright © 2017 The KCP Limited. All rights reserved. Terms of Use | Privacy Policy
Designed and Developed by Clasticon Solutions